Start-up Service

Duration: 1-3 days at your location

Contents

Preparations

  • Installation and configuration of the OMNITREND PC software
  • System inspection, selection of machine trains and incident analysis
  • Definition of measurement locations

Installation training

  • Installation of a VIBCODE measurement location if the VIBCODE package is being used
  • Creation of a sample database with the entry of machine parameters
  • Determination of measurement procedure and setup, taking into consideration process and operational variables
  • Definition of warning and alarm thresholds

Training on your machine

  • Diagnosis exercises using the measured values
  • Fine adjustments on the device and PC software.